A 0.45-acre parking lot at 41 Ashmont Street is the subject of a Major Site Plan application that would replace 45 leased parking spaces with two apartment buildings holding 63 units between them. The Portland Planning Board held a workshop on the application on August 11, 2026. For anyone who owns a home on the surrounding streets, this is the kind of filing worth reading directly rather than hearing about secondhand, because the public record already contains most of the details that neighbors tend to speculate about.

Table of Contents
What Is Proposed at 41 Ashmont Street
The applicant is DC 509 Forest LLC. According to the application materials submitted to the Planning and Urban Development Department, the plan calls for two multi-unit apartment buildings on the site. Building 1 is a 30-unit, four-story structure. Building 2 is a 33-unit, five-story structure. Together they account for the 63 dwelling units described in the Planning Board agenda, and the agenda lists 10 parking spaces for the completed development.
Both buildings are proposed as affordable housing, and each is tied to a different funding program. The application identifies Building 1 with the Home for Good residential program and Building 2 with the MaineHousing Low Income Housing Tax Credit program. The two buildings are expected to be financed individually, and the applicant has indicated that Building 1 may be built as an initial phase, though both could be constructed at the same time. The unit mix at 41 Ashmont Street is described as studio and one-bedroom apartments.
The project team named in the filing includes Invivid Architecture and LJB Inc, the engineering firm formerly known as Gorrill Palmer. The applicant has also signaled a possible subdivision of the property into two lots, with the dimensional layout not yet settled. That detail matters procedurally, because a subdivision triggers its own review track alongside the site plan.
The 41 Ashmont Street Site Today
The parcel is 19,619 square feet, or 0.45 acre, according to the boundary survey by Owen Haskell Inc, and it sits in the B-1 Neighborhood Business zone. Today it is a paved parking lot with a single driveway off Ashmont Street and 45 leased spaces. Many of those spaces are leased to tenants at 509 Forest Avenue, which the applicant also owns; the properties share a common deed recorded in the Cumberland County Registry of Deeds at Book 39688, Page 7.
The surrounding land uses are mixed. A parking lot and an office building sit to the east. The Clairmont Court Condominium is to the north. Parking and multi-unit residential uses are to the west. Single-family homes line the south side of Ashmont Street, directly opposite the site. The filing also notes two existing drainage catch basins believed to connect to a 36-inch storm drain in Ashmont Street, and an overhead utility line serving the Clairmont Court Condominium that would need to be relocated.
The parking arithmetic is the figure most neighbors notice first. The record describes 45 leased spaces on the site now and 10 spaces in the proposal. Those 45 spaces are not public parking; they are leased, and many serve a building the applicant owns on Forest Avenue. Whether their removal changes on-street conditions is exactly the sort of question the site plan review exists to examine, and it is a question to raise with the record in hand rather than from a neighborhood group thread.
Where 41 Ashmont Street Stands in Portland’s Review Process
Because the development includes more than three dwelling units, it requires Major Site Plan approval from the Planning Board under Table 13-A of Portland’s ReCode. The application lists several concurrent reviews: site plan review under Section 13.6, design review, historic preservation advisory review, subdivision review under Section 14, and affordable housing review under Section 17.2, which applies to multi-family residential of more than 10 units.
The timeline in the record starts earlier than most neighbors realize. A pre-application meeting was held on December 17, 2025. The engineering cover letter to the Planning and Urban Development Department is dated June 8, 2026. The Planning Board workshop on 41 Ashmont Street took place on August 11, 2026, and a workshop is not a vote. It is a working session where board members raise concerns and direct the applicant before any public hearing or decision.
That distinction is worth holding onto. Nothing about 41 Ashmont Street has been approved. An application at the workshop stage can be revised substantially, and unit counts, building heights, and parking figures have all been known to change between a workshop and a final plan. Anyone making a decision about their own property based on this filing should treat the current numbers as a proposal under review, not a settled outcome.
What 41 Ashmont Street Means for Nearby Owners
The honest answer on property values is that the public record does not establish one. The application file contains site dimensions, unit counts, zoning citations, and drainage details. It contains no analysis of what nearby homes will be worth, and any agent who tells a homeowner with certainty which direction values will move after a project like this is going beyond what the documents support.
What the record does support is more practical. Buyers researching a Portland neighborhood increasingly search municipal filings before they write an offer, and a pending application near 41 Ashmont Street is discoverable by anyone who looks. A seller on these streets is better served by knowing the details already, so a buyer’s question gets a straight answer rather than a surprised one. Construction timing, phasing, and the possible subdivision are all in the file.
Maine’s disclosure obligations attach to conditions of the property being sold, not to a neighbor’s pending permit, so a nearby application is generally not something a seller is required to disclose. Timing is the more useful question, and it is the one owners near 41 Ashmont Street tend to raise: list now, or wait to see what actually gets built. That decision sits inside the wider process of selling a home in Portland, with one local wrinkle. An application still at the workshop stage is a long way from a finished building, and the two buildings here are being financed separately, so even a full approval would not mean both go up at once.
How to Follow the 41 Ashmont Street Application
Portland publishes Planning Board agendas, full meeting packets, and minutes through its public meeting portal, and the 41 Ashmont Street materials sit in the packet for the August 11, 2026 meeting. The packet is the substantive document. It carries the engineering cover letter, the site details, and the plan set, and it is where the specifics live rather than in the one-paragraph agenda summary.
Anyone tracking this should watch for the item to return to a Planning Board agenda after the workshop, since the next appearance is where a public hearing and a vote would occur. Written comment submitted to the Planning and Urban Development Department becomes part of the packet for that meeting, which is how residents put concerns about drainage, the utility relocation, or the parking change into the record in a form the board reads.
Has 41 Ashmont Street been approved?
No. As of the August 11, 2026 Planning Board workshop, the 41 Ashmont Street application was at the workshop stage, which is a working session rather than a vote. No approval had been granted and the plan remained subject to revision.
How many units are proposed at 41 Ashmont Street?
The Planning Board agenda for 41 Ashmont Street describes 63 affordable dwelling units in two buildings: a four-story building with 30 units and a five-story building with 33 units, along with 10 parking spaces.
What is on the 41 Ashmont Street site now?
The 41 Ashmont Street site is a paved parking lot of 19,619 square feet, or 0.45 acre, containing 45 leased parking spaces with a single driveway. Many of the spaces are leased to tenants at 509 Forest Avenue.
Does a seller have to disclose the 41 Ashmont Street project to buyers?
Maine disclosure obligations attach to the condition of the property being sold rather than to a neighbor’s pending application, so a project such as 41 Ashmont Street is generally not a required disclosure. The David Marshall Team still recommends that sellers understand nearby filings, because buyers research them.
Where can residents read the 41 Ashmont Street filing?
The 41 Ashmont Street materials are published in the City of Portland Planning Board packet for the August 11, 2026 meeting through the city’s public meeting portal. The packet contains the engineering letter and site details rather than only the agenda summary.
Development filings like 41 Ashmont Street are public long before they become visible on the ground, and the gap between the two is where informed decisions get made. A homeowner who reads the packet knows what is actually proposed, what stage it has reached, and what could still change. That is a better footing than reacting to a rumor after the excavators arrive.
Owners near 41 Ashmont Street who are weighing what the filing means for their own timing can get a property-specific read rather than a neighborhood rumor. David Marshall and The David Marshall Team work Greater Portland and can walk through what the 41 Ashmont Street record does and does not establish, then set it against the current figures for a specific street and price band. Homeowners can request a free copy of The Wicked Seller and a personalized home value analysis, or start the conversation about selling with no obligation.
eXp Realty | The David Marshall Team
David Marshall, REALTORĀ®
41 Hutchins Drive, Building 3
Portland, ME 04102
207-409-6617
davidmarshallteam.com/sell
Instagram: @davidmarshallteam
